June 01, 2026
GeoSWMM 5.6.0 delivers a redesigned Profile Plot Tool along with a range of workflow improvements across model setup and validation. Together, these updates make profile generation faster, validation more reliable, and everyday modeling workflows smoother and more intuitive.
The Profile Plot Tool has been significantly enhanced to generate ground elevation and hydraulic profiles more quickly, accurately, and meaningfully. Improved path-selection logic ensures accurate profiles in complex networks, requiring fewer manual edits and streamlining workflows.
The tool now integrates directly with the Elevation Manager, allowing extraction of high-resolution ground elevations from DEM data and displaying them in profile plots. A visual comparison of ground surface and pipe crown elevations helps users quickly identify discrepancies between topographic data and model inputs.
A new Flow Profile Options menu enables plotting of dynamic water surface elevations alongside maximum water surface elevations, providing a comprehensive view of simulation results.
A new Plot Options panel gives users greater control over profile visualization. Line styles, node symbols, feature labels, gridlines, chart titles, and axis settings can now be customized, enabling cleaner, more presentation-ready plots.
Enhanced export options now support additional file formats and higher-resolution images, improving the quality of profile reporting and documentation.
.png%3Fprefix%3Dassets%252Fprod%252Fmedia&w=1920&q=75&dpl=dpl_8wRFdydT9GqaCYTKyMfZfvqnKczL)
Repeated runs of the Watershed Delineation Tool now provide options to Overwrite, Append, or Discard existing delineation results when model features already exist in the project. This enhancement helps prevent accidental data loss and improves iterative watershed development workflows.
Outlets created using Draw Outlet on Map are now validated against the DEM extent. Outlet points placed outside the DEM coverage trigger a warning and are excluded from subcatchment generation.
A new validation step has been added during 2D model setup to ensure that the boundary layer remains within the DEM extent. If the 2D boundary extends beyond DEM coverage, GeoSWMM now displays a warning before invalid mesh generation occurs.
The Network Analysis Tool has been enhanced to improve detection of orphan nodes and links containing missing or Null attribute values, helping identify data issues earlier in the modeling workflow.
GeoSWMM 5.6 has been upgraded to .NET 10 and is fully compatible with ArcGIS Pro 3.7. This update aligns GeoSWMM with the latest ArcGIS Pro development platform and Microsoft framework, ensuring continued compatibility, and improved application responsiveness and performance.
Issue Name | Description |
|---|---|
Boundary Layer Cleanup | The ‘Define Boundary Layer’ workflow now automatically removes temporary working layers from the Table of Contents (TOC) when the window is closed. |
Subcatchment LID Cleanup | Fixed an issue where deleted LIDs were not properly removed from subcatchments, which could cause simulation errors. |
Watershed Import Defaults | Fixed a rare issue where subcatchments and conduits imported from the Watershed Delineation Tool had User Defined Area and User Defined Length enabled by default. |
Improved Workflow for Importing INP Files | Fixed an issue where pollutant and land use property values defined in EPA SWMM INP files were not fully imported into the Pollutant Editor and Land Use Editor. |