Model Simulation

The GeoSWMM project files, Tutorial_01U.gdb and Tutorial_01D.gdb have been simulated in three scenarios i.e. for 2-year, 10-year and 100- year storm events. Then the runoff model results for each storm event are compared between the undeveloped and developed site scenarios. Total discharge is computed as the System Runoff or Outfall Total Inflow from the model. The following section describes simulation result summary.