IntroductionPost-Development Peak Discharge Mitigation Using Detention
Tutorial Scope
This tutorial extends the drainage network from Tutorial 02 by installing a detention pond at the catchment outfall.
The pond is represented by storage unit SU1, with an outlet made up of three orifices and a transverse weir. The user will configure the storage characteristics and outlet structures and evaluate their performance with design storms of multiple return periods.
The resulting model is reused in Tutorial 06 (runoff treatment) and Tutorial 09 (continuous simulation).