Model Simulation

The GeoSWMM project file- Tutorial_07.gdb has been simulated in two steps. In first step, the model is simulated for the 2-year design storm to see the surcharging and flooding behavior of the nodes and conduits (i.e. circular pipes, natural channels and street gutters). In second step, the model is simulated for the 100-year design storm and the interaction between underground conduits and roadside gutters are observed.

Following section describes simulation result summary obtained in above two steps.